FP6 - 19761
BIGPOWER - Advanced Biomass Gasification for High-Efficiency Power |
| Type of Project | STREP |
| Contract No | FP6 - 500311 |
| Total Cost | 2,940 KEuro |
| EC Contribution | 1,700 KEuro |
| Start Date | 7-9-2005 |
| Duration | Months |
Abstract
The BiGPower project aims to develop reliable, cost-effective and fuel flexible gasification technologies for high-efficiency small-to-medium scale (1-100 MWe) power production from biomass. The project is designed to create the fundamental and technical basis for successful industrial follow-up developments and demonstration projects aiming to commercial breakthrough by 2010-20. This overall aim is approached by carrying out in a pre-competitive manner well-focused activities on the key bottlenecks of advanced biomass gasification power systems.
Three promising European gasification technologies in this target size range have been selected to form the basis for the development of the 2nd generation processes:
In all biomass gasification processes, the product gas contains several types of gas contaminants, which have to be efficiently removed before utilising the gas in advanced power systems. The key technical solutions to be developed are:
Three most potential power production cycle alternatives are examined and developed:
The performance and techno-economic feasibility of these advanced gasification-to-power concepts will be examined by carrying out detailed case studies in different European regions.
Coordinator
VTT Processes, Finland
Partners
Contacts
Contact
© Copyright 2006 Policy Statements