NNE5-1999-20229
M O N - C H P: Optimised Biomass CHP Plant for Monaghan Integrating Condensing Economiser Technology |
| Type of Project | Demonstration |
| Contract No | NNE5-1999-20229 |
| Total Cost | |
| EC Contribution | |
| Start Date | 1999 |
| Duration | 58 Months |
| Scientific Officer | Kyriakos Maniatis |
Abstract
The objective of this project is to build a 28 MW optimised biomass fired CHP plant in Monaghan, Ireland, and demonstrate a bubbling fluidised bed boiler with high plant availability of 92% and innovative integrated condensing economiser technology. The energy will be produced from spent mushroom compost (a world first). An overall energy efficiency (including auxiliary load) of 44.5%, heat to power ratio of 1 and an electrical efficiency of 26% will be achieved, reducing investment and operating costs by 18%.
132 kt of CO2 emissions (O.5kg/kWh) will be avoided. A serious environmental problem, which has become a major barrier to the expansion of agricultural and horticultural businesses in the region, will be solved and the position of European SMEs in the world market for biomass will be strengthened.
Project Participants
Contacts
Contact
© Copyright 2006 Policy Statements
Updated
by CPL Press:
03/07/2007
- biomatnet@biomatnet.org
![]() |
![]() |
News |
Events |