NNE5-2000-00189
Demonstration of Three Innovative Steam Boiler Parts for a Considerably Higher Electricity Recovery Rate in Waste Incineration - HIGH ENERGY RECOVERY |
| Type of Project | Demonstration |
| Contract No | NNE5-2000-00189 |
| Total Cost | |
| EC Contribution | |
| Start Date | 2000 |
| Duration | 72 Months |
| Scientific Officer | Jose Riesgo Villanueva |
Abstract
This project aims to achieve waste incineration with steam parameters higher than shown thus far to reach a considerably better efficiency in electricity generation than is common in existing waste-incineration processes. In Europe, gross rates of 25% are accomplished at best in stand-alone waste incineration. To go beyond 34% gross rate will mean an improvement of 36% in electrical energy recovery. from waste This implies no less than a new set standard in the waste-to-energy field. That is also true for the net rate reached which will be well above 30%. There are three main objectives for the HRAVI project:
A so-called RAMSE (Reliability, Availability, Maintainability, Safety, Environment) analyses based on waste-to-energy experience statistics collected over the last 85 years will further improve the design and performance over the years.
Project Participants
Contacts
Contact
© Copyright 2006 Policy Statements
Updated
by CPL Press:
03/07/2007
- biomatnet@biomatnet.org
![]() |
![]() |
News |
Events |